First GNC charging installation at Mallorca

Details of the article

Mallorca, betting on the decarbonization of the island, has carried out at its EMT Palma facilities the first GNC charging installation for city buses that generates its own electricity for the operation of the facility, charging 150 city buses daily through 6 pumps in parallel.

To do so, an electricity generator of 1250 kVA was installed which feeds both compressors, which provide a flow rate of 10,000 Nm3 / h.

With this installation, the Palma de Mallorca transport will reduce emissions of particles in suspension by 80%, 2/3 of CO2 emissions and 100% if it is fed with biomethane, providing a much healthier environment.

Leave a Reply